Out
of the given quality management principles, which one emphasizes on
understanding & meeting current and future needs of the customers?
a. Customer focus
b. Process approach
c. System approach to management
d. Continual improvement
How
many mandatory documented procedures are required by ISO9001 Quality Management
System?
a. 4
b. 6
c. 8
d. 10
ISO9001
aims to enhance the satisfaction of :
a. Employees
b. Stake holders
c. Customers
d. Employers
e. Management
What
needs to be ensured prior to their communication to the supplier.
a. Price
b. Packing
c. Adequacy of purchase requirements
d. Transportation
Which
clause of ISO 9001:2008 refers to the working conditions and is used
to ensure that the product manufacturing requirements are being met?
a. clause 6.4
b. clause 7.2.1
c. clause 6.3
d. clause 6.2.1
Appropriate
records of education, training, skills and experience of the employees of the
organization should be maintained by:
a. quality assurance department
b. external quality auditors
c. accounts department
d. personnel department
The
purpose of conducting Management Review is to
a. ensure effectiveness of the
Quality Management System
b. conduct external audits
c. fix responsibility for
non-conformities
d. increase the production trends
Which
clause of ISO9001:2008 specifies the requirement for a Quality Policy?
a. Quality management system 4.2
b. Management responsibility 5.3
c. Resource management 6.2
d. Product realization 7.1
An
activity of using resources to transform inputs into outputs is called:
a. Method
b. Process
c. Procedure
d. System
Whose
satisfaction is necessarily to be monitored and measured?
a. Employees
b. Customer
c. Owners
d. Producers
Special
Instructions: The following question may have more than one correct answer
options
Documented procedure for control of records must define controls for their:
Documented procedure for control of records must define controls for their:
a. identification
b. storage and protection
c. retention and retrieval
d. none of the above
________
is required to analyze and compare the adequacy of the system resources in
order to improve and achieve product quality.
a. quality audit
b. quality assurance
c. quality conformance
d.
quality evaluation
The
ISO9001 standard requires that a Management Representative should be:
a. An external person
b. A member of the management of the
organization
c. Consultant
d. Visitor to the organization
Quality
Manual need not be documented for the Quality Management System of an
organization:
a. True
b. False
Monitoring
and measurement equipment must be calibrated or validated
a. during production process
b. as and when required
c. before using the equipment
d. only before ISO audit
The
ISO members who have one vote each, irrespective to the strength of the economy
are grouped as:
a. full members
b. correspondent members
c. subscriber members
d.
partial members
Special
Instructions: The following question may have more than one correct answer
options
ISO9001 certified organization is permitted to use an approved logo of the certifying body on its following items:
ISO9001 certified organization is permitted to use an approved logo of the certifying body on its following items:
a. Stationery
b. Product
c. Advertising Material
d. Anywhere
Out
of the given quality management principles, which one emphasizes on
understanding & meeting requirements, and also obtaining effective results?
a. customer focus
b. process approach
c. system approach to management
d. continual improvement
The
organization actually responsible for Design and Development of product can
claim exclusion of Clause 7.3 of the standard ISO9001.
a. True
b. False
Special
Instructions: The following question may have more than one correct answer
options
Quality Objectives should be:
Quality Objectives should be:
a. Intangible
b. Imaginary
c. Measurable
d. Consistent with Quality Policy
___________
is the technical committee of Environmental Management Systems.
a. ISO/TC 207
b. ISO/TC 206
c. ISO/TC 205
d. ISO/TC 204
Guidelines
for 'performance improvement' based upon the quality management principles are
included in:
a. ISO 9000
b. ISO 9001
c. ISO 9004
d. ISO 14001
In
case any element cannot be applied to an ISO system due to the nature of an
organization, it can be considered for exclusion as per:
a. Clause 8
b. Clause 6
c. Clause 7
d. Clause 9
The
ISO9000 family of standards has been published by:
a. International Standards
Organization
b. International Statistical
Institute
c. International Organization for
Standardization
Necessary
competence of the personnel working in the organization which has implemented
ISO9001 is determined by:
a. Production manager
b. Personnel manager
c. Quality Auditor
d. Quality Assurance manager
Follow-up
audit, after Internal Audit observation of non-conformity
a. is not required
b. is performed every six months
c. is required to verify the
effectiveness of the corrective action
Which
ISO standard sets guidelines for auditing Quality Management Systems and
Environmental Management Systems?
a. ISO 9000:2005
b. ISO 19011:2002
c. ISO 14001:9000
d. ISO 14001:9001
Which
clause of ISO9001:2008 requires the statement of Quality Policy in the Quality
Management System?
a. Clause 4.2
b. Clause 5.3
c. Clause 6.2
d. Clause 7.1
Under
which clause of ISO9001, it is mandatory to identify Customer property?
a. Clause 7.2
b. Clause 8.2.2
c. Clause 7.5.4
d. Clause 7.6
Which
of the following clause makes it mandatory to maintain the Records of
Preventive Actions taken?
a. Clause 8.4
b. Clause 8.5.2
c. Clause 7.5.3
d. Clause 7.3.7
The
operational technique or activity required to fulfill quality requirements is:
a. Quality assurance
b. Quality control
c. Quality surveillance
d. Quality rating
ISO9001
promotes adoption of the following approach while developing, implementing and
improving the effectiveness of the Quality Management System
a. Element based
b. Dictatorial
c. Process based
d. Manager based
_________
is applied to corrective and preventive actions to prevent a problem from re-occurring.
a. Dynamic Analysis
b. Finite element analysis
c. Analysis of Variance
d. Root Cause Analysis
Product
realization does not include:
a. determination of requirements
related to the product
b. customer communication
c. design and development planning
d. monitoring and measurement of
processes
The
work that the organization goes through to develop, manufacture, and deliver
the finished goods or services is called
a. manufacturing
b. product validation
c. product planning and control
d. product realization
The
Technical Committee which considers, drafts and finalizes the International
Quality Management System, ISO9001, is:
a. ISO/TC186
b. ISO/TC176
c. ISO/TC167
d. ISO/TC168
Which
clause of ISO9001 makes it mandatory to have Documented Procedure for Document
Control?
a. Clause 6.2.2
b. Clause 4.2.3
c. Clause 4.2.4
d. Clause 5.4.1
__________
is required for periodically keeping the system revitalized.
a.
registration audit
b. internal audit
c. pre-assessment or system audit
d. surveillance audit
In
PDCA cycle P stands for Plan, D stands for Do, A stands for Act. What does C
stand for?
a. Control
b. Co-ordinate
c. Check
d. Create
All
purchased products could be verified by:
a. Incoming inspection
b. Review and verification of
supplier's Test Certificate
c. Inspection at supplier's premises
d. Any one or more of the above